Single girder KBK crane in welding prodction line

Six units of 250KG single girder kbk crane were installed in Baofeng’s old workshop. The workshop used to fabricate welding piece in big size, but now the welding work have moved to new workshop because of expension. Baofeng wants to use this old workshop to do the assemlbe and welding for the small workpieces.

COST & SPACE SAVING

But in limit of workshop structure and lifting capcity, the three big overhead is too less for croweded lifting requirement and its too much for the current workpieces (around 200kg).

In order to improve the trouble and cost, we designed the single girder KBK crane system in help old structure. Which means only half of supporting structure is asked to install the KBK crane system.

One side of the KBK crane runway is welded on the existed column of workshop, and thanks to the evenly distributed load. The column can afford the new load by simple enhance supports.

The other side of the runway is laied on newly build steel pipes, because of the low dead weight of KBK crane system. The supporting can use structure steel in small size to save cost and space.

PERFECT COMBINATION WITH BIG OVERHEAD CRANE

The newly build KBK crane will not effect the travle of big overhead crane, also it is much more easy to handle and use.

EFFORTLESS MOVE OF CRANE TROLLEY

Enclosed KBK track design minimizes the crane trolley from out side polution. The Crane trolley is easy to move even loaded. And long service life save maitance cost for users.

Single girder KBK crane in welding prodction line Single girder KBK crane in welding prodction line Single girder KBK crane in welding prodction line